The closed mound is the work. A pile of finished coal is the day after.
Ash on the boots stays. Sweeping a path to the mound makes a yard he does not burn in.
The people who call are the yard and the buyers who take coal from a mound that has already been opened on its own day.
People
Four people. Gheorghe keeps the cover. Ana writes the numbers. Mihai watches the yard. Doina grades the burn.

Keeps the cover

The mound numbers

The yard

The grade of the burn
Milestones
2013 A yard in Glodeni asks for the closed mound, not for a sack of coal
2017 A broken mound is labeled open
2020 Stopped cutting a hole for the camera
2023 Ash on the ground stays
2025 The break is the end of that file
Turf, a rake, a closed mound. Strada Prieteniei 18.
See the studio